Operations
SV635
Flight report details and route overview.
OEJN OJAI Accepted
SV635
Passenger (Scheduled)
Block off
Sun, Jul 26, 2026 4:27 PM
Block on
Sun, Jul 26, 2026 6:25 PM
Flight Time
1h 58m
Filed Route
MIGDA L677 WEJ M449 MUNRA
Map
Flight Phase Timeline
Blocks Off
16:27:22Z
Taxi: 4m 20s
Takeoff (34R)
16:35:14Z
Enroute 1h 58m
Landing (26L)
18:20:29Z
Taxi: 5m 6s
Blocks On
18:25:35Z
Flight Telemetry Analytics
Mass & Fuel Summary
Ramp Phase
Total Ramp Mass
63,950 kg
Fuel: 8,198 kg
Takeoff Phase
Gross / Fuel
63,849 kg
Fuel: 8,097 kg
Landing Phase
Gross / Fuel
59,425 kg
Fuel: 3,673 kg
At Gate
Burned Fuel
4,587 kg
Reserve: 3,611 kg
Attitude Indicator
Takeoff
OEJN RWY 34R
PITCH
—
ROLL
—
HDG
—
Landing
OJAI RWY 26L
PITCH
—
ROLL
—
HDG
—
Touchdown Performance
Landing Rate
-326.79 fpm
Perfect (0)
Firm (-300)
Hard (-600)
G-Force
1.28 G
1.0 G
1.5 G
2.0+ G
Touchdown Positioning
Threshold Dist.
389.62 m
Deviation
4.04 m
26L
Threshold (0m)
Runway End (3,660m)
| Description | Credit | Debit |
|---|---|---|
| Passenger fare: Y: 134; price: 145.95, cost: 0 | $19,557.30 | |
| Passenger fare: J: 17; price: 583.79, cost: 0 | $9,924.43 | |
| Cargo fare: CGO: 3645; price: 0.1693, cost: 0 | $617.09 | |
| InFlight Sales | Duty Free | $200.00 | $156.00 |
| Expense: Terminal Services | $6,443.17 | |
| Fuel Cost (0.5/lbs) | $5,055.97 | |
| Expense: National Passenger Ground Handling Charges (Departure) | $962.63 | |
| Expense: Standard Catering (Short Haul) | $922.81 | |
| Expense: Passenger Ground Handling Charges (Arrival) | $679.50 | |
| Pilot Payment @ 280 | $550.66 | |
| Expense: Air Traffic Services | $500.55 | |
| Expense: Landing Charges | $499.14 | |
| Expense: Security Charges (Arrival) | $425.82 | |
| Expense: Security Charges (Departure) | $321.63 | |
| Expense: Fuel Service | $202.24 | |
| Expense: Service Charges | $200.83 | |
| Expense: Cabin Crew Salary (4 FAs) | $196.67 | |
| Expense: Potable Water Supply Service (Cat C) | $133.33 | |
| Expense: Aerobridge Usage (Cat C) | $133.33 | |
| Expense: Cargo Ground Handling Charges (Arrival) | $133.00 | |
| Expense: National Cargo Ground Handling Charges (Departure) | $113.05 | |
| Expense: Video Docking Guidance System (VDGS) | $106.67 | |
| Expense: Ground Power Unit (GPU - Cat C) | $66.67 | |
| Expense: Cabin Waste & Toilet Evacuation Service (Cat C) | $40.00 | |
| Subtotals | $30,298.82 | $17,843.67 |
| Net Total | $12,455.15 | |
| Time | Entry |
|---|---|
| Sun, Jul 26, 2026 4:16 PM | METAR OEJN 261616Z 31908KT 9999 37 Q1003 |
| Sun, Jul 26, 2026 4:16 PM | Starting at gate Gate A 24 (Ramp GA Medium) |
| Sun, Jul 26, 2026 4:16 PM | Started boarding at 2026-07-26T16:16:41Z, aircraft: FenixA321 CFM SL TC (Saudia Airlines HZ-AS52) |
| Sun, Jul 26, 2026 4:27 PM | Wing Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Packs set to on |
| Sun, Jul 26, 2026 4:27 PM | Landing Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Battery set to on |
| Sun, Jul 26, 2026 4:27 PM | Landing Gear set to down |
| Sun, Jul 26, 2026 4:27 PM | Seatbelts set to on |
| Sun, Jul 26, 2026 4:27 PM | Anti-Ice set to off |
| Sun, Jul 26, 2026 4:27 PM | Navigation Lights set to on |
| Sun, Jul 26, 2026 4:27 PM | Transponder set to on |
| Sun, Jul 26, 2026 4:27 PM | Taxi Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Logo Light set to on |
| Sun, Jul 26, 2026 4:27 PM | Strobe Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Started pushback |
| Sun, Jul 26, 2026 4:27 PM | External Power set to off |
| Sun, Jul 26, 2026 4:27 PM | Doors set to on |
| Sun, Jul 26, 2026 4:27 PM | Engine 2 is off |
| Sun, Jul 26, 2026 4:27 PM | Autopilot set to off |
| Sun, Jul 26, 2026 4:27 PM | Engine 1 is off |
| Sun, Jul 26, 2026 4:27 PM | Emergency Lights set to on |
| Sun, Jul 26, 2026 4:27 PM | APU set to on |
| Sun, Jul 26, 2026 4:27 PM | Beacon Lights set to on |
| Sun, Jul 26, 2026 4:27 PM | Engine 2 is on |
| Sun, Jul 26, 2026 4:28 PM | Engine 1 is on |
| Sun, Jul 26, 2026 4:28 PM | Parking brake set |
| Sun, Jul 26, 2026 4:29 PM | APU set to off |
| Sun, Jul 26, 2026 4:29 PM | Packs set to off |
| Sun, Jul 26, 2026 4:29 PM | Packs set to on |
| Sun, Jul 26, 2026 4:29 PM | Flaps set to CONF 1+F |
| Sun, Jul 26, 2026 4:29 PM | Taxi Lights set to on |
| Sun, Jul 26, 2026 4:30 PM | Wing Lights set to on |
| Sun, Jul 26, 2026 4:30 PM | Parking brake released |
| Sun, Jul 26, 2026 4:30 PM | Started taxi out |
| Sun, Jul 26, 2026 4:33 PM | Landing Lights set to on |
| Sun, Jul 26, 2026 4:33 PM | Strobe Lights set to on |
| Sun, Jul 26, 2026 4:34 PM | Takeoff Time: 2026-07-26T16:34:45Z |
| Sun, Jul 26, 2026 4:34 PM | Started Takeoff |
| Sun, Jul 26, 2026 4:34 PM | Taxi time was 4m 20s |
| Sun, Jul 26, 2026 4:35 PM | Landing Gear set to up |
| Sun, Jul 26, 2026 4:35 PM | Taxi Lights set to off |
| Sun, Jul 26, 2026 4:36 PM | Flaps set to CONF 1 |
| Sun, Jul 26, 2026 4:36 PM | Flaps set to UP |
| Sun, Jul 26, 2026 4:39 PM | Crossed above 10,000 feet |
| Sun, Jul 26, 2026 4:39 PM | Landing Lights set to off |
| Sun, Jul 26, 2026 4:39 PM | Wing Lights set to off |
| Sun, Jul 26, 2026 4:39 PM | Seatbelts set to off |
| Sun, Jul 26, 2026 5:46 PM | On approach |
| Sun, Jul 26, 2026 6:09 PM | Seatbelts set to on |
| Sun, Jul 26, 2026 6:10 PM | Landing Lights set to on |
| Sun, Jul 26, 2026 6:10 PM | Wing Lights set to on |
| Sun, Jul 26, 2026 6:14 PM | On final approach |
| Sun, Jul 26, 2026 6:15 PM | Flaps set to CONF 1 |
| Sun, Jul 26, 2026 6:15 PM | Flaps set to CONF 1+F |
| Sun, Jul 26, 2026 6:15 PM | Flaps set to CONF 2 |
| Sun, Jul 26, 2026 6:15 PM | Landing Gear set to down |
| Sun, Jul 26, 2026 6:16 PM | Flaps set to CONF 3 |
| Sun, Jul 26, 2026 6:16 PM | Flaps set to FULL |
| Sun, Jul 26, 2026 6:16 PM | Taxi Lights set to on |
| Sun, Jul 26, 2026 6:20 PM | Runway deviation, rwy heading(mag)=260.3278503417969 (31.719282,36.014541) |
| Sun, Jul 26, 2026 6:20 PM | Threshold Crossing Height: 39.01 ft |
| Sun, Jul 26, 2026 6:20 PM | Landing rate: -326.79 |
| Sun, Jul 26, 2026 6:20 PM | Runway 26L, threshold distance: 389.62 m |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 3 |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 2 |
| Sun, Jul 26, 2026 6:21 PM | Landing Lights set to off |
| Sun, Jul 26, 2026 6:21 PM | Strobe Lights set to off |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 1+F |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 1 |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to UP |
| Sun, Jul 26, 2026 6:23 PM | APU set to on |
| Sun, Jul 26, 2026 6:25 PM | Parking brake set |
| Sun, Jul 26, 2026 6:25 PM | APU set to off |
| Sun, Jul 26, 2026 6:25 PM | APU set to on |
| Sun, Jul 26, 2026 6:25 PM | Engine 1 is off |
| Sun, Jul 26, 2026 6:25 PM | Arrived at gate: South Parking 22 (Ramp GA Medium) |
| Sun, Jul 26, 2026 6:25 PM | Taxi In Time: 5m 6s |
| Sun, Jul 26, 2026 6:25 PM | Setting on block |
| Sun, Jul 26, 2026 6:25 PM | Blocks on time: 2026-07-26T18:25:35Z |
| Sun, Jul 26, 2026 6:25 PM | Engine 2 is off |
| Sun, Jul 26, 2026 6:25 PM | Seatbelts set to off |
| Sun, Jul 26, 2026 6:25 PM | Wing Lights set to off |
| Sun, Jul 26, 2026 6:25 PM | Taxi Lights set to off |
| Sun, Jul 26, 2026 6:25 PM | Beacon Lights set to off |
| Sun, Jul 26, 2026 6:25 PM | APU set to off |
| Sun, Jul 26, 2026 6:25 PM | Packs set to off |
| Sun, Jul 26, 2026 6:26 PM | Doors set to off |