Operations
SV635
Flight report details and route overview.
OEJN → OJAI
Accepted
SV635
Passenger (Scheduled)
HZ-ASAN (A21N)
Accepted
1h 58m
740 nmi
Filed Route:
MIGDA L677 WEJ M449 MUNRA
Block off:
2026-07-26 16:27:22
Flight Time:
1h 58m
Block on:
2026-07-26 18:25:35
Map
Flight Phase Timeline
Blocks off
16:27:22Z
Taxi out 4m 20s
Takeoff
16:35:14Z
RWY 34R
Enroute 1h 49m
Landing
18:20:29Z
RWY 26L
Taxi in 5m 6s
Blocks on
18:25:35Z
Flight Telemetry Analytics
Mass & Fuel Summary
Ramp
63,950kg
Fuel on board
8,198 kg
Takeoff
63,849kg
Fuel
8,097 kg
Landing
59,425kg
Fuel
3,673 kg
At gate
4,587kg
Reserve
3,611 kg
Attitude Indicator
Takeoff
OEJN RWY 34R
Pitch
—
Roll
—
Hdg
—
Landing
OJAI RWY 26L
Pitch
—
Roll
—
Hdg
—
Touchdown Performance
Landing rate
-326.79fpm
Perfect (0)Firm (-300)Hard (-600)
Firm
G-force
1.28G
1.0 G1.5 G2.0+ G
Normal
Touchdown Positioning
Threshold dist.
389.62m
Deviation
4.04m
Heading dev.
1.7°
Surface wind
289°
12KT
26L
Threshold (0 m)
Runway end (3,660 m)
Financial Report
| Description | Credit | Debit |
|---|---|---|
| Passenger fare: Y: 134; price: 145.95, cost: 0 | $19,557.30 | |
| Passenger fare: J: 17; price: 583.79, cost: 0 | $9,924.43 | |
| Cargo fare: CGO: 3645; price: 0.1693, cost: 0 | $617.09 | |
| InFlight Sales | Duty Free | $200.00 | $156.00 |
| Expense: Terminal Services | $6,443.17 | |
| Fuel Cost (0.5/lbs) | $5,055.97 | |
| Expense: National Passenger Ground Handling Charges (Departure) | $962.63 | |
| Expense: Standard Catering (Short Haul) | $922.81 | |
| Expense: Passenger Ground Handling Charges (Arrival) | $679.50 | |
| Pilot Payment @ 280 | $550.66 | |
| Expense: Air Traffic Services | $500.55 | |
| Expense: Landing Charges | $499.14 | |
| Expense: Security Charges (Arrival) | $425.82 | |
| Expense: Security Charges (Departure) | $321.63 | |
| Expense: Fuel Service | $202.24 | |
| Expense: Service Charges | $200.83 | |
| Expense: Cabin Crew Salary (4 FAs) | $196.67 | |
| Expense: Potable Water Supply Service (Cat C) | $133.33 | |
| Expense: Aerobridge Usage (Cat C) | $133.33 | |
| Expense: Cargo Ground Handling Charges (Arrival) | $133.00 | |
| Expense: National Cargo Ground Handling Charges (Departure) | $113.05 | |
| Expense: Video Docking Guidance System (VDGS) | $106.67 | |
| Expense: Ground Power Unit (GPU - Cat C) | $66.67 | |
| Expense: Cabin Waste & Toilet Evacuation Service (Cat C) | $40.00 | |
| Subtotals | $30,298.82 | $17,843.67 |
| Net total | $12,455.15 | |
Flight Log
| Time | Entry |
|---|---|
| Sun, Jul 26, 2026 4:16 PM | METAR OEJN 261616Z 31908KT 9999 37 Q1003 |
| Sun, Jul 26, 2026 4:16 PM | Starting at gate Gate A 24 (Ramp GA Medium) |
| Sun, Jul 26, 2026 4:16 PM | Started boarding at 2026-07-26T16:16:41Z, aircraft: FenixA321 CFM SL TC (Saudia Airlines HZ-AS52) |
| Sun, Jul 26, 2026 4:27 PM | Wing Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Packs set to on |
| Sun, Jul 26, 2026 4:27 PM | Landing Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Battery set to on |
| Sun, Jul 26, 2026 4:27 PM | Landing Gear set to down |
| Sun, Jul 26, 2026 4:27 PM | Seatbelts set to on |
| Sun, Jul 26, 2026 4:27 PM | Anti-Ice set to off |
| Sun, Jul 26, 2026 4:27 PM | Navigation Lights set to on |
| Sun, Jul 26, 2026 4:27 PM | Transponder set to on |
| Sun, Jul 26, 2026 4:27 PM | Taxi Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Logo Light set to on |
| Sun, Jul 26, 2026 4:27 PM | Strobe Lights set to off |
| Sun, Jul 26, 2026 4:27 PM | Started pushback |
| Sun, Jul 26, 2026 4:27 PM | External Power set to off |
| Sun, Jul 26, 2026 4:27 PM | Doors set to on |
| Sun, Jul 26, 2026 4:27 PM | Engine 2 is off |
| Sun, Jul 26, 2026 4:27 PM | Autopilot set to off |
| Sun, Jul 26, 2026 4:27 PM | Engine 1 is off |
| Sun, Jul 26, 2026 4:27 PM | Emergency Lights set to on |
| Sun, Jul 26, 2026 4:27 PM | APU set to on |
| Sun, Jul 26, 2026 4:27 PM | Beacon Lights set to on |
| Sun, Jul 26, 2026 4:27 PM | Engine 2 is on |
| Sun, Jul 26, 2026 4:28 PM | Engine 1 is on |
| Sun, Jul 26, 2026 4:28 PM | Parking brake set |
| Sun, Jul 26, 2026 4:29 PM | APU set to off |
| Sun, Jul 26, 2026 4:29 PM | Packs set to off |
| Sun, Jul 26, 2026 4:29 PM | Packs set to on |
| Sun, Jul 26, 2026 4:29 PM | Flaps set to CONF 1+F |
| Sun, Jul 26, 2026 4:29 PM | Taxi Lights set to on |
| Sun, Jul 26, 2026 4:30 PM | Wing Lights set to on |
| Sun, Jul 26, 2026 4:30 PM | Parking brake released |
| Sun, Jul 26, 2026 4:30 PM | Started taxi out |
| Sun, Jul 26, 2026 4:33 PM | Landing Lights set to on |
| Sun, Jul 26, 2026 4:33 PM | Strobe Lights set to on |
| Sun, Jul 26, 2026 4:34 PM | Takeoff Time: 2026-07-26T16:34:45Z |
| Sun, Jul 26, 2026 4:34 PM | Started Takeoff |
| Sun, Jul 26, 2026 4:34 PM | Taxi time was 4m 20s |
| Sun, Jul 26, 2026 4:35 PM | Landing Gear set to up |
| Sun, Jul 26, 2026 4:35 PM | Taxi Lights set to off |
| Sun, Jul 26, 2026 4:36 PM | Flaps set to CONF 1 |
| Sun, Jul 26, 2026 4:36 PM | Flaps set to UP |
| Sun, Jul 26, 2026 4:39 PM | Crossed above 10,000 feet |
| Sun, Jul 26, 2026 4:39 PM | Landing Lights set to off |
| Sun, Jul 26, 2026 4:39 PM | Wing Lights set to off |
| Sun, Jul 26, 2026 4:39 PM | Seatbelts set to off |
| Sun, Jul 26, 2026 5:46 PM | On approach |
| Sun, Jul 26, 2026 6:09 PM | Seatbelts set to on |
| Sun, Jul 26, 2026 6:10 PM | Landing Lights set to on |
| Sun, Jul 26, 2026 6:10 PM | Wing Lights set to on |
| Sun, Jul 26, 2026 6:14 PM | On final approach |
| Sun, Jul 26, 2026 6:15 PM | Flaps set to CONF 1 |
| Sun, Jul 26, 2026 6:15 PM | Flaps set to CONF 1+F |
| Sun, Jul 26, 2026 6:15 PM | Flaps set to CONF 2 |
| Sun, Jul 26, 2026 6:15 PM | Landing Gear set to down |
| Sun, Jul 26, 2026 6:16 PM | Flaps set to CONF 3 |
| Sun, Jul 26, 2026 6:16 PM | Flaps set to FULL |
| Sun, Jul 26, 2026 6:16 PM | Taxi Lights set to on |
| Sun, Jul 26, 2026 6:20 PM | Runway deviation, rwy heading(mag)=260.3278503417969 (31.719282,36.014541) |
| Sun, Jul 26, 2026 6:20 PM | Threshold Crossing Height: 39.01 ft |
| Sun, Jul 26, 2026 6:20 PM | Landing rate: -326.79 |
| Sun, Jul 26, 2026 6:20 PM | Runway 26L, threshold distance: 389.62 m |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 3 |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 2 |
| Sun, Jul 26, 2026 6:21 PM | Landing Lights set to off |
| Sun, Jul 26, 2026 6:21 PM | Strobe Lights set to off |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 1+F |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to CONF 1 |
| Sun, Jul 26, 2026 6:21 PM | Flaps set to UP |
| Sun, Jul 26, 2026 6:23 PM | APU set to on |
| Sun, Jul 26, 2026 6:25 PM | Parking brake set |
| Sun, Jul 26, 2026 6:25 PM | APU set to off |
| Sun, Jul 26, 2026 6:25 PM | APU set to on |
| Sun, Jul 26, 2026 6:25 PM | Engine 1 is off |
| Sun, Jul 26, 2026 6:25 PM | Arrived at gate: South Parking 22 (Ramp GA Medium) |
| Sun, Jul 26, 2026 6:25 PM | Taxi In Time: 5m 6s |
| Sun, Jul 26, 2026 6:25 PM | Setting on block |
| Sun, Jul 26, 2026 6:25 PM | Blocks on time: 2026-07-26T18:25:35Z |
| Sun, Jul 26, 2026 6:25 PM | Engine 2 is off |
| Sun, Jul 26, 2026 6:25 PM | Seatbelts set to off |
| Sun, Jul 26, 2026 6:25 PM | Wing Lights set to off |
| Sun, Jul 26, 2026 6:25 PM | Taxi Lights set to off |
| Sun, Jul 26, 2026 6:25 PM | Beacon Lights set to off |
| Sun, Jul 26, 2026 6:25 PM | APU set to off |
| Sun, Jul 26, 2026 6:25 PM | Packs set to off |
| Sun, Jul 26, 2026 6:26 PM | Doors set to off |